As we designed out features many weeks ago, we engineered into the structures hard points to mount, join and lift each feature. These were located precisely in order to achieve a balanced and safe load as we lifted each piece. On the bottom or end of each piece is a place we can bolt it to a custom size pallet which is designed to slip into a shipping container and not allow side to side movement during the 11,500 kilometre journey to Dubai.



