One of our projects is for a home prefabricator in Alberta. The preliminary design was hand drawn on my computer using PhotoShop and my digital drawing pad.
Once the design was approved we put measurements to paper and everything was submitted to the local authorities for permits. This seemed to take a long time but eventually we got through that process.
In the next week or so I'll be welding up the pencil rod sub structure for the sculpted rock work. I'll also be creating the routing files for the sun and the lettering which will be routed from 30lb Precision Board. I'll be using Heico LED lights and surface lighting on this project as well to make it highly visible at night.
Stay tuned...
-dan